Micron is a pioneer Company in the Egyption market offers the complete solutions for Power& automation systems Products & Materials components, installation,commissioning,training& after sale services .


livestock Division ... livestock Division ...livestock Division
Copyright © 2008 Micron - All Rights Reserved.  Powered by advanced_a1
1 - phase of construction works



2 _ stage to identify sewer




3 - a metal structure installation




4 - the installation of production line Supplement





5 - Machines production line (sinks principled _ and final cooling principled (Schiller))





6 - spending and refrigerators





 
(Boiler water heating)



Construction works
the production process within the Slaughterhouse
1 - a comment and slaughter
Any suspension manually and are massacred by Islamic law
Then with belts basin blood and blood withdrawn by pumps
The remnants ..




2 - Scald the stage and on feathers
Continue to move in the movement of chickens by heating hot water temperature 60 m for two minutes submerged
Water controls the temperature through the steam kettle, with chicken corridor to move the plastic side Swab
a Rubber spin move


3 - On the stage of the viscera
remove done manually or by hand knives
  then washed in the strength of perforated (refineries)
And then cut the neck and money well-bird





4 - Stage projection and spare legs







5 - the initial stage of washing






6 - the final stage of washing and cooling principled
will be spent in the cooling temperature of 25 Dc to Degrees Celsius
And speed according to the Energy slaughterhouse and the duration of cooling about 75 minutes
from the beginning to enter the cooling even exit through the course of carrier





7 - packing stage and the final product



Profile      /      Objectivies      /      VISION      /      MISSION       /     Industres       /         Contact Us      /      Location